<< <%SKIN-STRTRANS-SYNTOC%> >> Navigation: »No topics above this level« Schedule |
There are two Schedules available and they can be set at four tree node levels: System, Country, POP and Route.
The statuses set up will be indicated in the tree.
1. At System level the Schedule overrides all Country, POP and Route Schedules.
2. At Country level the Schedule overrides all POP and Route Schedules.
3. At POP level the Schedule overrides all Route Schedules.