Schedule

<< <%SKIN-STRTRANS-SYNTOC%> >>

Navigation:  »No topics above this level«

Schedule

There are two Schedules available and they can be set at four tree node levels: System, Country, POP and Route.

 

The statuses set up will be indicated in the tree.

 

Routes Schedule in tree

 

1. At System level the Schedule overrides all Country, POP and Route Schedules.

 

System Schedule

 

System Schedule Set

 

2. At Country level the Schedule overrides all POP and Route Schedules.

 

Country Schedule

 

3. At POP level the Schedule overrides all Route Schedules.

 

POP Schedule

 

POP Schedule Set